Super Stud Building Products
  • About
    • About Us
    • Design Build Solutions
    • Privacy Policy
    • Areas We Serve
  • Products
    • Products Overview
    • Clips and Accessories
      • Aluminum Breakaway Clips
      • Clip Angles
      • Cold-Rolled Channel CRC
      • Corrugated Steel Decking
      • Deflection Clips and Accessories
      • F-Track Corner Framing
      • Flat Strap
      • Furring Channel
      • Furring Channel Clips
      • GlidePlate™ Deflection Clips
      • Gusset Plates
      • Header Jamb and Cripple Clip
      • J L and U-Trims
      • Joist Bridle Hangers
      • Resilient Channel
      • S/HJCT Steel-Joist Connectors
      • Simpson Strong-Tie® SUBH
      • SuperBead® Drywall Corner Bead
      • SuperJoist Blocking
      • Utility Angles
      • Web Stiffeners
      • Z-Furring Channel
    • Interior Framing
      • The Edge™ Drywall Framing
      • Shaft Wall Systems
      • Deep Leg Track
    • Steel Wall Panel Systems
      • FroMar™ Steel Panel System
    • Structural Framing
      • Load Bearing Systems
      • Curtainwall Systems
      • Super Joist and SuperMAXX Joist
      • Super Stud and SuperMAXX Stud
    • Hollow Metal Doors and Frames
      • Galaxy Metal Products
    • Deflection Track
      • Slotted Deflection Track
    • Vinyl Trims and Beads
      • 1-1/4 inch Vinyl Corner Bead
      • 1-1/4 inch Flexible Vinyl Corner Bead
      • 3/4 inch Bullnose Vinyl Corner Bead
      • 3/4 inch Flexible Bullnose Vinyl Corner Bead
      • Paper-faced Inside Corner Trim
      • Paper-faced Metal Corner Bead
      • Vinyl J-Trim
      • Vinyl L-Trim
      • Vinyl L-Trim with Tear Strip
  • Specs & Resources
    • Architectural Specifications
    • Testing Data
    • Sustainability and Green Building
    • Safety Data Sheets
    • Warranty Information
    • AIA Continuing Education
    • Load Tables and Limiting Heights
    • Product Catalogs
    • CAD Library
    • Joist Installation Instructions
    • SuperJoist Blocking Installation Instructions
  • Engineering
    • Engineering Services and Shop Drawings
    • Design-Assist Services
    • Client Document Upload
  • Submittal Builder
  • Super Clip Depot
  • News
  • Careers
  • Contact
  • About
    • About Us
    • Design Build Solutions
    • Privacy Policy
    • Areas We Serve
  • Products
    • Products Overview
    • Clips and Accessories
      • Aluminum Breakaway Clips
      • Clip Angles
      • Cold-Rolled Channel CRC
      • Corrugated Steel Decking
      • Deflection Clips and Accessories
      • F-Track Corner Framing
      • Flat Strap
      • Furring Channel
      • Furring Channel Clips
      • GlidePlate™ Deflection Clips
      • Gusset Plates
      • Header Jamb and Cripple Clip
      • J L and U-Trims
      • Joist Bridle Hangers
      • Resilient Channel
      • S/HJCT Steel-Joist Connectors
      • Simpson Strong-Tie® SUBH
      • SuperBead® Drywall Corner Bead
      • SuperJoist Blocking
      • Utility Angles
      • Web Stiffeners
      • Z-Furring Channel
    • Interior Framing
      • The Edge™ Drywall Framing
      • Shaft Wall Systems
      • Deep Leg Track
    • Steel Wall Panel Systems
      • FroMar™ Steel Panel System
    • Structural Framing
      • Load Bearing Systems
      • Curtainwall Systems
      • Super Joist and SuperMAXX Joist
      • Super Stud and SuperMAXX Stud
    • Hollow Metal Doors and Frames
      • Galaxy Metal Products
    • Deflection Track
      • Slotted Deflection Track
    • Vinyl Trims and Beads
      • 1-1/4 inch Vinyl Corner Bead
      • 1-1/4 inch Flexible Vinyl Corner Bead
      • 3/4 inch Bullnose Vinyl Corner Bead
      • 3/4 inch Flexible Bullnose Vinyl Corner Bead
      • Paper-faced Inside Corner Trim
      • Paper-faced Metal Corner Bead
      • Vinyl J-Trim
      • Vinyl L-Trim
      • Vinyl L-Trim with Tear Strip
  • Specs & Resources
    • Architectural Specifications
    • Testing Data
    • Sustainability and Green Building
    • Safety Data Sheets
    • Warranty Information
    • AIA Continuing Education
    • Load Tables and Limiting Heights
    • Product Catalogs
    • CAD Library
    • Joist Installation Instructions
    • SuperJoist Blocking Installation Instructions
  • Engineering
    • Engineering Services and Shop Drawings
    • Design-Assist Services
    • Client Document Upload
  • Submittal Builder
  • Super Clip Depot
  • News
  • Careers
  • Contact
  • Are Change Orders Good or Bad for Contractors

  • CFSEI to Host Webinar on Charge Order and Cold-Formed Steel on February 22, 2018

Super Stud Affiliate Companies

The Super Stud Affiliation of Companies manufacture and supply all of the necessary products and components to construct a complete, dried-in structural shell. No other company in the industry, regardless of size, can offer this comprehensive range of Design/Build Solutions to the design and contracting communities.

USGBC

Super Stud Building Products is a proud member of the United States Green Building Council


  • About
  • Areas
  • Design Build
  • Privacy
  • Products
  • Specifications
  • Testing
  • Sustainability
  • SDS
  • Warranty
  • AIA CE
  • Load Tables
  • Engineering
  • Upload
  • Submittals
  • News
  • How to Order
  • Contact

Subscribe to our Mailing List

Super Stud

2960 Woodbridge Avenue
Edison, New Jersey 08837-3406
(732) 662-6200 info@buysuperstud.com

SuperStud South

53 W. L. Runnels Industrial Drive
Hattiesburg, Mississippi 39401-8320
(601) 584-7550 sales@superstudsouth.com
SuperStud SuperStud
DragonBoard DragonBoard
FroMar FroMar
Galaxy Metal Doors Galaxy Metal Doors
Energex Energex
© 2019 by Super Stud Building Products. All rights reserved.